Preliminary draft charging schedule
The documents below were published as supporting evidence documents alongside the Preliminary Draft Charging Schedule.
PDCS supporting documents
Viability Assessment
- Download the Draft Viability Assessment (Jan 2013) (PDF 1.3mb)
- Download the Draft Viability Assessment -Addendum (Jan 2013) (PDF 195kb)
Draft Viability Assessment - Appendix 1, Market Evidence
- Download Comparison Retail (PDF 52kb)
- Download Convenience Retail and Supermarkets (PDF 48kb)
- Download Industrial Accommodation (PDF 47kb)
- Download Industrial Land (PDF 42kb)
- Download Leisure (PDF 56kb)
- Download Office Accommodation (PDF 63kb)
- Download Residential Accommodation (PDF 52kb)
- Download Residential Institutional (PDF 44kb)
- Download Residential Land (PDF 47kb)
- Download Retail Warehouse (PDF 47kb)
- Download Sui Generis (PDF 42kb)
Draft Viability Assessment - Appendix 2, Appraisal Summaries
- Available on request (file size too large to be published here)
Draft Viability Assessment - Appendix 3, Construction Costs
In order to demonstrate that a CIL charge is justified the Council must evidence a funding gap for infrastructure delivery.
- View the infrastructure planning evidence
PDCS Consultation documents